I am looking for the programming method to count and average readings during a data collection period. Example: Data Log Survey Duration 1 Hr. Cumulative average of temp readings for each channel averaged every 20 seconds.
Then plotted on a graph. If temp readings are both hi and low, then the cumulative avg. line for the graph would be centered horizontally in the graph.
Don't know if this can be overlaid? (possibly with Histogram, Pg. 65 of DT80 users manual). Is there another method to accomplish this? Results: presented using Mimic or external graphing source Final log survey is completed and final chart is plotted, with final sum cumulative plot.
Dean Phillips
I am looking for the programming method to count and average readings during a data collection period. Example: Data Log Survey Duration 1 Hr. Cumulative average of temp readings for each channel averaged every 20 seconds.
Then plotted on a graph. If temp readings are both hi and low, then the cumulative avg. line for the graph would be centered horizontally in the graph.
Don't know if this can be overlaid? (possibly with Histogram, Pg. 65 of DT80 users manual). Is there another method to accomplish this? Results: presented using Mimic or external graphing source Final log survey is completed and final chart is plotted, with final sum cumulative plot.
Dean Phillips