Hi,
I need to acquire data from edometric test. So, during a single test, i need to change the sampling rate, without stop the test (i.e. without interruption).
For example, sampling every 2 seconds for a minute; after, sampling every 60 seconds for the following hour; after, sampling every 30 minutes for the following seven hour. Altogether the test is 8 hour long.
If is possible this sequence, may I run more test with different start in a day?
Bye Giovanni
Hi,
I need to acquire data from edometric test. So, during a single test, i need to change the sampling rate, without stop the test (i.e. without interruption).
For example, sampling every 2 seconds for a minute; after, sampling every 60 seconds for the following hour; after, sampling every 30 minutes for the following seven hour. Altogether the test is 8 hour long.
If is possible this sequence, may I run more test with different start in a day?
Bye Giovanni